2,Life water supply and fire-fighting piping system above DN65;
3, rectangular cross-sectional area greater than or equal to 0.38m² and circular diameter greater than or equal to 0.7m duct system;
4, for the inner diameter greater than or equal to 60mm electrical distribution pipes and gravity greater than or equal to 150N/m cable ladder racks, cable bridges, bus ducts;
5, the scope of water supply and drainage design: ≥ DN65 water supply, hot water, fire, pressure drainage pipes or other equipment with gravity more than 1.8KN;
6, the scope of electrical design: diameter ≥ DN60 electrical piping, gravity ≥ 150N / m cable tray, cable trough box and bus duct.
7, the rest of the water supply and drainage, HVAC, electrical systems according to the specification requirements to set up seismic support hangers.0.
No. | Bracing code | Item name | Spec. of pipe |
1 | HG-01C | Integrated bracing 1 | Default DN150 |
2 | HG-02C | Integrated bracing 2 | Default DN150 |
3 | HG-03C | Integrated bracing 3 | Default DN150 |
4 | HG-04C | Integrated bracing 4 | Default DN150 |
5 | HG-05C | Integrated bracing 5 | Default DN150 |
Hot Tags: integrated system lateral bracing (lateral), China integrated system lateral bracing (lateral) manufacturers, suppliers, factory, standard clevis hanger, strut end cap, strut channel, cantilever arm, hexagon coupling nut, thread tie rod
Reviews
There are no reviews yet.